MOT Type 1 & Hardcore: How Much Do I Need?

MOT Type 1 & Hardcore: How Much Do I Need?

Published on November 24, 2026

Posted in Advice & Reviews

by MKM

7 min read

How Much Do I Need?

Ordering the right amount of sub-base is easier once you know the area, the finished compacted depth and the density of the material. This guide shows you how to calculate MOT Type 1, hardcore and sand in cubic metres, tonnes and MKM bulk bags, then explains how to choose and compact the right material.

How much MOT Type 1 do I need?

Measure the length and width in metres, then choose the finished compacted depth required for the project.

Length x width x depth = volume in cubic metres (m³)

For a useful planning estimate, allow around 2 tonnes of MOT Type 1 per compacted cubic metre. Actual density varies with the material and moisture content.

Area in m² x compacted depth in metres x 2 = estimated tonnes of MOT Type 1

MOT Type 1 worked example

For a 5m x 4m patio with a 100mm finished compacted sub-base:

• 5m x 4m = 20m²

• 100mm = 0.1m

• 20m² x 0.1m = 2m³

• 2m³ x 2 tonnes = 4 tonnes

• Add 10%: 4 x 1.10 = 4.4 tonnes

Quick-estimate table

Area

75mm

100mm

150mm

10m²

1.5t

2t

3t

20m²

3t

4t

6t

30m²

4.5t

6t

9t

50m²

7.5t

10t

15t

Figures use 2t/m³ and exclude any ordering allowance. They are estimates, not a project specification.

How many 850kg bulk bags of MOT Type 1 do I need?

Divide the required tonnage by the declared weight of one bag in tonnes, then round up to a whole bag.

Tonnes required ÷ bulk bag weight in tonnes = number of bags

For the example above: 4.4 ÷ 0.85 = 5.18, so order 6 x 850kg bulk bags. Bag weights can vary by product and region.

Browse our bulk sand and aggregates

What is hardcore?

Hardcore is a general site term for crushed, broken or recycled material used as fill or as a foundation layer beneath paths, patios, driveways and concrete. It may include crushed concrete, brick or stone, or a specified graded sub-base such as MOT Type 1.

The word “hardcore” does not guarantee a particular grading or performance. Mixed demolition rubble is not automatically a substitute for a specified sub-base. If the drawing, installer or system calls for MOT Type 1, order MOT Type 1 rather than unspecified hardcore.

How much hardcore or other aggregate do I need?

Use the same volume calculation, but use the density supplied for the actual material:

Length x width x depth = cubic metres

Cubic metres x material density in tonnes per m³ = tonnes required

For irregular areas, split the shape into rectangles and add the results. Add a sensible allowance for uneven ground and handling. Around 2t/m³ is a common planning figure for compactable crushed hardcore, although density varies by product.

Hardcore worked example: 3m x 2.5m shed base

For a 3m x 2.5m shed base with a 100mm finished compacted hardcore layer:

• 3m x 2.5m = 7.5m²

• 100mm = 0.1m

• 7.5m² x 0.1m = 0.75m³

• 0.75m³ x 2 tonnes = 1.5 tonnes

• Add 10%: 1.5 x 1.10 = 1.65 tonnes

That’s two 850kg bulk bags (1.7 tonnes). If you’re using recycled or crushed concrete hardcore, check the product’s density, as it can differ from MOT Type 1.

What is aggregate?

Aggregate is the broad name for granular construction materials such as sand, gravel, crushed stone and recycled aggregate. It may be used loose for drainage or landscaping, compacted as a sub-base, or combined with cement and water in concrete and mortar.

Aggregate describes a family of materials, not one interchangeable product. Sharp sand, building sand, ballast, gravel, MOT Type 1 and crushed concrete have different grading, drainage, compaction and end uses. Order the material specified for the job.

MOT Type 1, Type 2 and Type 3: what is the difference?

• MOT Type 1: a well-graded crushed material containing larger particles and fines. It compacts tightly to form a dense, stable, load-bearing sub-base for many paths, patios, driveways and building bases.

• Type 2: a granular sub-base that can include uncrushed natural gravel and sand, as well as crushed material. It generally provides less load-bearing capacity than Type 1 and is better suited to lighter-duty areas where the project specification allows it.

• Type 3: an open-graded or reduced-fines material used where water needs to pass through the sub-base, including some permeable paving and SuDS build-ups.

Do not swap these materials without checking the design. A permeable surface needs the complete build-up to maintain drainage performance.

How deep should a sub-base be?

• Paths and pedestrian areas: around 75–100mm compacted.

• Patios: around 75–100mm compacted on suitable firm ground.

• Shed and light garden-building bases: around 100mm compacted.

• Concrete slab bases: commonly around 100–150mm compacted for domestic work, subject to slab design, use and ground conditions.

• Domestic driveways: around 100–150mm compacted on suitable ground.

• Heavy vehicles, weak ground or commercial loading: use a designed construction rather than a rule of thumb.

Soft, wet, clay or disturbed ground may need extra excavation, drainage, geotextile, capping or a deeper engineered build-up. Calculate from the finished compacted depth, not the loose depth after tipping.

How to compact MOT Type 1 or hardcore properly

Compaction turns loose aggregate into a stable sub-base. Tipping the full depth and running a plate over the top can leave loose material underneath.

1. Prepare the formation. Remove topsoil, organic material and soft spots, then set levels and any required fall.

2. Lay manageable layers. For a small vibrating plate, 50–75mm loose per layer is a practical starting point. Follow the machine manufacturer’s instructions and project specification.

3. Compact every layer before adding the next. Make slow, overlapping passes across the whole area, including edges and corners. Three to four passes in each direction may be needed, but continue until visible settlement stops.

4. Check the result. The layer should feel firm underfoot, with no pumping, rutting or material building up in front of the plate.

5. Rework soft spots before covering them. Reduce the layer thickness or investigate weak and wet ground below.

Material should be damp enough for the fines to bind but not waterlogged. Use suitable PPE and follow the hire company’s safety guidance. Never use a petrol compactor in an enclosed space.

Sharp sand vs building sand: which should I use?

Sharp sand is coarser and more angular. It is commonly used in suitable concrete mixes, floor screeds and specified paving or bedding applications. Building sand is finer and more workable, so it is commonly used for bricklaying, blockwork and general mortar. They are not automatic substitutes, so follow the specified mix or paving-system instructions.

Should I order loose or bagged sand?

• Small bags suit repairs, small mortar batches and restricted storage.

• Bulk bags keep quantities contained and suit many domestic jobs, provided the delivery vehicle can place them safely.

• Loose loads can suit larger quantities where there is tipper access, a safe tipping area and enough clean storage space.

How much sharp sand do I need?

For a measured layer, a useful planning density is around 1.6t/m³: area in m² x depth in metres x 1.6 = tonnes. For 12m² at 40mm: 12 x 0.04 x 1.6 = 0.768 tonnes. Add 10% and the estimate is about 0.85 tonnes, approximately one 850kg bulk bag.

How much building sand do I need?

For a measured layer only, use around 1.5t/m³ as a planning figure: area x depth x 1.5 = tonnes. For mortar, calculate from the number and size of bricks or blocks, joint thickness, waste and the specified mix instead.

Shop packed sand and aggregates

Common aggregate calculation mistakes

• Forgetting to convert millimetres to metres: 100mm is 0.1m.

• Using loose depth instead of finished compacted depth.

• Compacting one deep lift rather than working in layers.

• Assuming all bulk bags have the same weight.

• Treating aggregate, hardcore and MOT Type 1 as interchangeable.

• Ignoring soft ground, drainage or the installation specification.

• Ordering the exact calculation with no allowance for uneven excavation or handling.

FAQs

How much hardcore do I need per square metre?

At 100mm compacted depth and 2t/m³, allow about 0.2 tonnes or 200kg per square metre before an ordering allowance.

How much MOT Type 1 does one 850kg bulk bag cover?

Using 2t/m³, one 850kg bag covers about 4.25m² at 100mm compacted depth before an allowance.

How much area does one tonne cover?

At 100mm compacted depth and 2t/m³, one tonne covers approximately 5m².

Is MOT Type 1 the same as hardcore?

MOT Type 1 is often called hardcore, but hardcore is a general term. Type 1 is a graded sub-base product.

Do I need a membrane under MOT Type 1?

A suitable geotextile may be needed over weak, silty or clay ground. It does not replace proper excavation, drainage, compaction or depth.

Can I use Type 1 under a concrete slab?

Yes, it is commonly used as a compacted sub-base. Around 100–150mm is a typical domestic estimating range, but the design, load and ground conditions control the build-up.

Get the quantities right before you order

Measure carefully, confirm the specified material and compacted depth, then calculate volume before converting it into tonnes or bags. Check bag weights and local availability, and speak to your local MKM branch if the ground is poor or the project needs a designed build-up.